As per the Q6 API, the ACDB configuration need to be sent to Q6 after the PREPARE stage of the device switch. But in the current code it is in the reverse order. Hence correcting the code as per the Q6 API. Change-Id: I9f947d44f73b1fc71ddea8259ca54402edc895c2 Signed-off-by: Phani Kumar Allada <pallad@codeaurora.org>